Geotechnical & Soil calculator

    Bearing Capacity Calculator (Terzaghi)

    The free Bearing Capacity Calculator (Terzaghi) by CM PRO helps site engineers, quantity surveyors, contractors and homeowners ultimate and safe bearing capacity of strip, square, circular and rectangular footings with water table correction. It supports both metric and imperial units and gives instant results for checking safe bearing capacity of isolated, strip, circular and rectangular footings, including a high water table.

    How the Bearing Capacity Calculator (Terzaghi) works

    qult = sc·c·Nc + q·Nq + sγ·γ·B·Nγ (Terzaghi). Nq = e^(2(3π/4 − φ/2)tanφ) ÷ (2cos²(45° + φ/2)), Nc = (Nq − 1)cotφ, Nγ ≈ 2(Nq + 1)tanφ. Shape factors: strip 1.0/0.5, square 1.3/0.4, circular 1.3/0.3. Safe capacity = qult ÷ FS.

    How to use this calculator

    1. Sign up free and verify your email to unlock the calculator.
    2. Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
    3. Enter the footing shape, cohesion c, friction angle φ, soil unit weight γ, footing width b, footing length l, foundation depth df, water table depth, factor of safety.
    4. Results update instantly — read the quantities in the Results panel.
    5. Add a wastage allowance and confirm against your drawings and specifications before ordering.

    Typical uses

    Checking safe bearing capacity of isolated, strip, circular and rectangular footings, including a high water table.

    Assumptions & limitations

    Results are planning estimates based on standard assumptions for geotechnical & soil work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.

    Frequently asked questions

    How does the Bearing Capacity Calculator (Terzaghi) work?
    qult = sc·c·Nc + q·Nq + sγ·γ·B·Nγ (Terzaghi). Nq = e^(2(3π/4 − φ/2)tanφ) ÷ (2cos²(45° + φ/2)), Nc = (Nq − 1)cotφ, Nγ ≈ 2(Nq + 1)tanφ. Shape factors: strip 1.0/0.5, square 1.3/0.4, circular 1.3/0.3. Safe capacity = qult ÷ FS.
    Can I use the Bearing Capacity Calculator (Terzaghi) in feet and inches?
    Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
    When should I use the Bearing Capacity Calculator (Terzaghi)?
    Checking safe bearing capacity of isolated, strip, circular and rectangular footings, including a high water table.
    Is this construction calculator free?
    Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.

    Related searches: bearing capacity calculator, Terzaghi bearing capacity, safe bearing capacity of soil, shallow foundation calculator, bearing capacity factors Nc Nq Ngamma.

    Also try these tools

    Run your whole site with CM PRO ERP