How the SPT N-Value Correction (N60 & (N1)60) works
N60 = N × (ER ÷ 60) × CB × CS × CR. σ′v = γz − γw(z − zw). CN = √(100 ÷ σ′v) ≤ 1.7 (Liao & Whitman). (N1)60 = CN × N60. φ = √(20 (N1)60) + 20 (Hatanaka & Uchida). Dr = √((N1)60 ÷ 60) (Skempton). Allowable pressure for 25 mm settlement by Bowles (Meyerhof).
How to use this calculator
- Sign up free and verify your email to unlock the calculator.
- Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
- Enter the field spt blows (n), hammer energy ratio, test depth below ground, water table depth, soil bulk unit weight, borehole diameter, sampler, footing width b (for allowable pressure), footing depth df.
- Results update instantly — read the quantities in the Results panel.
- Add a wastage allowance and confirm against your drawings and specifications before ordering.
Typical uses
Turning raw borehole log blow counts (ASTM D1586) into corrected N values for foundation design checks and soil investigation reviews.
Assumptions & limitations
Results are planning estimates based on standard assumptions for geotechnical & soil work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.
Frequently asked questions
- How does the SPT N-Value Correction (N60 & (N1)60) work?
- N60 = N × (ER ÷ 60) × CB × CS × CR. σ′v = γz − γw(z − zw). CN = √(100 ÷ σ′v) ≤ 1.7 (Liao & Whitman). (N1)60 = CN × N60. φ = √(20 (N1)60) + 20 (Hatanaka & Uchida). Dr = √((N1)60 ÷ 60) (Skempton). Allowable pressure for 25 mm settlement by Bowles (Meyerhof).
- Can I use the SPT N-Value Correction (N60 & (N1)60) in feet and inches?
- Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
- When should I use the SPT N-Value Correction (N60 & (N1)60)?
- Turning raw borehole log blow counts (ASTM D1586) into corrected N values for foundation design checks and soil investigation reviews.
- Is this construction calculator free?
- Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.
Related searches: SPT N value correction calculator, N60 calculator, (N1)60 overburden correction, SPT to friction angle, ASTM D1586 calculator.




