Geotechnical & Soil calculator

    USCS Soil Classification (ASTM D2487)

    The free USCS Soil Classification (ASTM D2487) by CM PRO helps site engineers, quantity surveyors, contractors and homeowners group symbol and name from sieve results and Atterberg limits, with A-line check and swell risk. It supports both metric and imperial units and gives instant results for classifying borrow, subgrade and foundation soils from lab sieve and Atterberg limit results.

    How the USCS Soil Classification (ASTM D2487) works

    PI = LL − PL. A-line: PI = 0.73 (LL − 20). Fine soil when ≥ 50% passes No. 200; gravel vs sand by the No. 4 sieve; well-graded gravel Cu ≥ 4, sand Cu ≥ 6, with 1 ≤ Cc ≤ 3; 5–12% fines gives a dual symbol (ASTM D2487).

    How to use this calculator

    1. Sign up free and verify your email to unlock the calculator.
    2. Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
    3. Enter the passing no. 200 sieve (0.075 mm), passing no. 4 sieve (4.75 mm), liquid limit ll, plastic limit pl, cu = d60/d10 (coarse soils), cc = d30²/(d10·d60) (coarse soils).
    4. Results update instantly — read the quantities in the Results panel.
    5. Add a wastage allowance and confirm against your drawings and specifications before ordering.

    Typical uses

    Classifying borrow, subgrade and foundation soils from lab sieve and Atterberg limit results.

    Assumptions & limitations

    Results are planning estimates based on standard assumptions for geotechnical & soil work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.

    CM PRO vs generic online concrete calculators

    FeatureGeneric calculatorsCM PRO
    Dry volume factorOften ignored — wet volume used directly, under-ordering ~35%1.54 dry factor applied to every site mix
    Plant mix (psi)Treated like a volume ratioSeparate weight-batch designs: 3000 psi = 330 kg, 4000 psi = 425 kg cement/m³
    Pakistani unitsm³ onlyBags (50 kg), cft for sand & crush, metric or imperial input
    Custom mix designNot availableEnter your lab mix (kg/m³) with two sands and two crush sizes
    ExportScreenshot onlyPrint / PDF calculation sheet with your verified account
    Link to estimatingStand-aloneSame norms as CM PRO Rate Analysis and BOQ

    Site glossary (Pakistan)

    Cft (cubic feet)
    Common site unit for sand and crush; 1 m³ = 35.31 cft.
    Bori / bag
    One cement bag = 50 kg ≈ 1.25 cft (0.0347 m³).
    Bajri / crush
    Coarse aggregate (3/4" or 3/8"), sold by cft or truck.
    Ret / Lawrencepur sand
    Coarse sand for concrete; Ravi sand is finer and used in plaster/masonry.
    Trolley / dumper
    Tractor trolley ≈ 100–125 cft; dumper ≈ 400–600 cft of sand or crush.
    Dry factor 1.54
    Wet concrete shrinks as voids fill; dry material needed = wet volume × 1.54.
    Marla / kanal
    Plot area: 1 marla = 225 sq ft (Punjab standard), 20 marla = 1 kanal.

    Concrete mix questions

    Why multiply concrete volume by 1.54?
    Loose cement, sand and crush contain voids. When mixed with water the volume shrinks, so about 54% more dry material is required than the finished wet volume.
    How many cement bags are in 1 m³ of 1:2:4 concrete?
    About 6.3 bags: 1.54 ÷ 7 × 1440 kg ÷ 50 kg. Sand ≈ 0.44 m³ (15.5 cft) and crush ≈ 0.88 m³ (31 cft).
    Is 1:2:4 the same as 3000 psi?
    No. 1:2:4 is a volume ratio for site mixing. 3000 psi is a strength class supplied by a batching plant to a weight design (about 330 kg cement per m³). Use the matching option.

    Frequently asked questions

    How does the USCS Soil Classification (ASTM D2487) work?
    PI = LL − PL. A-line: PI = 0.73 (LL − 20). Fine soil when ≥ 50% passes No. 200; gravel vs sand by the No. 4 sieve; well-graded gravel Cu ≥ 4, sand Cu ≥ 6, with 1 ≤ Cc ≤ 3; 5–12% fines gives a dual symbol (ASTM D2487).
    Can I use the USCS Soil Classification (ASTM D2487) in feet and inches?
    Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
    When should I use the USCS Soil Classification (ASTM D2487)?
    Classifying borrow, subgrade and foundation soils from lab sieve and Atterberg limit results.
    Is this construction calculator free?
    Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.

    Related searches: USCS soil classification calculator, ASTM D2487, plasticity chart A-line, CL CH ML MH classification, soil group symbol.

    Also try these tools

    Run your whole site with CM PRO ERP