Unit Converters calculator

    Area Converter

    The free Area Converter by CM PRO helps site engineers, quantity surveyors, contractors and homeowners m² to sq ft, marla and kanal. It supports both metric and imperial units and gives instant results for plot sizes, marla/kanal and square feet.

    How the Area Converter works

    1 m² = 10.7639 sq ft; 1 marla = 225 sq ft; 1 kanal = 20 marla.

    How to use this calculator

    1. Sign up free and verify your email to unlock the calculator.
    2. Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
    3. Enter the square metres.
    4. Results update instantly — read the quantities in the Results panel.
    5. Add a wastage allowance and confirm against your drawings and specifications before ordering.

    Typical uses

    Plot sizes, marla/kanal and square feet.

    Assumptions & limitations

    Results are planning estimates based on standard assumptions for unit converters work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.

    Frequently asked questions

    How does the Area Converter work?
    1 m² = 10.7639 sq ft; 1 marla = 225 sq ft; 1 kanal = 20 marla.
    Can I use the Area Converter in feet and inches?
    Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
    When should I use the Area Converter?
    Plot sizes, marla/kanal and square feet.
    Is this construction calculator free?
    Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.

    Related searches: area converter, marla to square feet, kanal calculator, sq m to sq ft.

    Also try these tools

    Run your whole site with CM PRO ERP