Project Management calculator

    Weighted Progress

    The free Weighted Progress by CM PRO helps site engineers, quantity surveyors, contractors and homeowners overall progress from weighted items. It supports both metric and imperial units and gives instant results for monthly progress reports and S-curves.

    How the Weighted Progress works

    Overall % = Σ(weight × progress) ÷ Σ weights.

    How to use this calculator

    1. Sign up free and verify your email to unlock the calculator.
    2. Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
    3. Enter the structure weight, structure done, finishes weight, finishes done, mep weight, mep done.
    4. Results update instantly — read the quantities in the Results panel.
    5. Add a wastage allowance and confirm against your drawings and specifications before ordering.

    Typical uses

    Monthly progress reports and S-curves.

    Assumptions & limitations

    Results are planning estimates based on standard assumptions for project management work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.

    Frequently asked questions

    How does the Weighted Progress work?
    Overall % = Σ(weight × progress) ÷ Σ weights.
    Can I use the Weighted Progress in feet and inches?
    Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
    When should I use the Weighted Progress?
    Monthly progress reports and S-curves.
    Is this construction calculator free?
    Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.

    Related searches: weighted progress calculator, percent complete construction, physical progress.

    Also try these tools

    Run your whole site with CM PRO ERP