Unit Converters calculator

    Length Converter

    The free Length Converter by CM PRO helps site engineers, quantity surveyors, contractors and homeowners metres to feet, inches and yards. It supports both metric and imperial units and gives instant results for converting drawings between metric and imperial.

    How the Length Converter works

    1 m = 3.28084 ft = 39.3701 in = 1.09361 yd.

    How to use this calculator

    1. Sign up free and verify your email to unlock the calculator.
    2. Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
    3. Enter the metres.
    4. Results update instantly — read the quantities in the Results panel.
    5. Add a wastage allowance and confirm against your drawings and specifications before ordering.

    Typical uses

    Converting drawings between metric and imperial.

    Assumptions & limitations

    Results are planning estimates based on standard assumptions for unit converters work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.

    Frequently asked questions

    How does the Length Converter work?
    1 m = 3.28084 ft = 39.3701 in = 1.09361 yd.
    Can I use the Length Converter in feet and inches?
    Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
    When should I use the Length Converter?
    Converting drawings between metric and imperial.
    Is this construction calculator free?
    Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.

    Related searches: metres to feet, length converter, m to ft.

    Also try these tools

    Run your whole site with CM PRO ERP