How the Labour Cost Calculator works
Cost = Workers × Days × Daily wage.
How to use this calculator
- Sign up free and verify your email to unlock the calculator.
- Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
- Enter the workers, daily wage, days, overheads.
- Results update instantly — read the quantities in the Results panel.
- Add a wastage allowance and confirm against your drawings and specifications before ordering.
Typical uses
Labour budgets for gangs and crews.
Assumptions & limitations
Results are planning estimates based on standard assumptions for estimating & cost work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.
Frequently asked questions
- How does the Labour Cost Calculator work?
- Cost = Workers × Days × Daily wage.
- Can I use the Labour Cost Calculator in feet and inches?
- Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
- When should I use the Labour Cost Calculator?
- Labour budgets for gangs and crews.
- Is this construction calculator free?
- Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.
Related searches: labour cost calculator, construction labour estimate, daily wage cost.









