Estimating & Cost calculator

    Markup & Margin

    The free Markup & Margin by CM PRO helps site engineers, quantity surveyors, contractors and homeowners selling price from cost and markup. It supports both metric and imperial units and gives instant results for pricing tenders and subcontract quotations.

    How the Markup & Margin works

    Price = Cost × (1 + Markup). Margin = Profit ÷ Price.

    How to use this calculator

    1. Sign up free and verify your email to unlock the calculator.
    2. Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
    3. Enter the cost, markup.
    4. Results update instantly — read the quantities in the Results panel.
    5. Add a wastage allowance and confirm against your drawings and specifications before ordering.

    Typical uses

    Pricing tenders and subcontract quotations.

    Assumptions & limitations

    Results are planning estimates based on standard assumptions for estimating & cost work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.

    Frequently asked questions

    How does the Markup & Margin work?
    Price = Cost × (1 + Markup). Margin = Profit ÷ Price.
    Can I use the Markup & Margin in feet and inches?
    Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
    When should I use the Markup & Margin?
    Pricing tenders and subcontract quotations.
    Is this construction calculator free?
    Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.

    Related searches: markup vs margin calculator, construction profit margin, tender pricing.

    Also try these tools

    Run your whole site with CM PRO ERP