Finishes calculator

    Plaster Calculator

    The free Plaster Calculator by CM PRO helps site engineers, quantity surveyors, contractors and homeowners cement and sand for wall plaster. It supports both metric and imperial units and gives instant results for internal and external cement plaster.

    How the Plaster Calculator works

    Mortar = Area × Thickness; dry volume = wet × 1.27; cement and sand split by ratio.

    How to use this calculator

    1. Sign up free and verify your email to unlock the calculator.
    2. Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
    3. Enter the plaster area, thickness, mix.
    4. Results update instantly — read the quantities in the Results panel.
    5. Add a wastage allowance and confirm against your drawings and specifications before ordering.

    Typical uses

    Internal and external cement plaster.

    Assumptions & limitations

    Results are planning estimates based on standard assumptions for finishes work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.

    Frequently asked questions

    How does the Plaster Calculator work?
    Mortar = Area × Thickness; dry volume = wet × 1.27; cement and sand split by ratio.
    Can I use the Plaster Calculator in feet and inches?
    Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
    When should I use the Plaster Calculator?
    Internal and external cement plaster.
    Is this construction calculator free?
    Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.

    Related searches: plaster calculator, cement plaster quantity, sand for plaster.

    Also try these tools

    Run your whole site with CM PRO ERP