Earthwork & Site calculator

    Field Density Test (Sand Cone)

    Enter your calibrated sand density, cone correction, excavated wet soil mass, moisture content and laboratory MDD to get the in-place dry density and degree of compaction. Set the required compaction from your project specification to see a pass or fail result.

    How the Field Density Test (Sand Cone) works

    Sand in hole = total sand used − cone and base correction. Hole volume = sand in hole ÷ calibrated sand density. Wet density = wet soil mass ÷ hole volume. Dry density = wet density ÷ (1 + moisture content ÷ 100). Compaction % = field dry density ÷ laboratory maximum dry density (MDD) × 100.

    How to use this calculator

    1. Calibrate your sand and cone correction using ASTM D1556 / AASHTO T191.
    2. Enter total sand used, cone correction and calibrated sand density.
    3. Enter the wet soil mass from the hole and its moisture content.
    4. Enter the laboratory MDD from the specified Proctor test and your project's required compaction.
    5. Read dry density, compaction percentage and the pass/fail result, then print the report.

    Typical uses

    Checking compaction of backfill, subgrade, embankment and road layers against the compaction percentage stated in your project specification.

    Assumptions & limitations

    Use calibrated apparatus and the specified laboratory Proctor result. This sheet supports your field record; acceptance remains subject to the project specification, approved ITP and the Engineer's review.

    Frequently asked questions

    Does the calculator assume 95% compaction?
    No. You enter the required compaction yourself from the project specification or approved ITP. The sand cone method itself sets no universal acceptance limit.
    Which standard does it follow?
    The calculation follows the sand cone / sand replacement relationships in ASTM D1556/D1556M and AASHTO T191, with laboratory MDD from ASTM D698 or D1557 as specified.
    Can I print the result?
    Yes. Print or save the calculation sheet as PDF with project, location, layer and date references.

    Related searches: field density test calculator, sand cone test calculation, FDT compaction percentage, ASTM D1556 calculator, dry density from sand replacement.

    Also try these tools

    Run your whole site with CM PRO ERP