Earthwork & Site calculator

    Excavation Calculator

    The free Excavation Calculator by CM PRO helps site engineers, quantity surveyors, contractors and homeowners excavated volume with bulking. It supports both metric and imperial units and gives instant results for foundation trenches, basements and pits.

    How the Excavation Calculator works

    Volume = Length × Width × Depth, with a swell factor for loose volume.

    How to use this calculator

    1. Sign up free and verify your email to unlock the calculator.
    2. Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
    3. Enter the length, width, depth, bulking.
    4. Results update instantly — read the quantities in the Results panel.
    5. Add a wastage allowance and confirm against your drawings and specifications before ordering.

    Typical uses

    Foundation trenches, basements and pits.

    Assumptions & limitations

    Results are planning estimates based on standard assumptions for earthwork & site work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.

    Frequently asked questions

    How does the Excavation Calculator work?
    Volume = Length × Width × Depth, with a swell factor for loose volume.
    Can I use the Excavation Calculator in feet and inches?
    Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
    When should I use the Excavation Calculator?
    Foundation trenches, basements and pits.
    Is this construction calculator free?
    Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.

    Related searches: excavation calculator, earthwork volume, digging volume calculator.

    Also try these tools

    Run your whole site with CM PRO ERP