Construction Method Statements
Painting Works Method Statement
Internal emulsion and external weather-shield painting.
Reference standards: Manufacturer data sheet
Procedure
- Plaster must be cured and dry (moisture ≤ 15%).
- Sand, fill cracks and apply alkali-resistant primer.
- Apply putty/filler in 2 coats and sand smooth.
- Apply 2–3 finish coats with roller or spray, allowing drying time between coats.
- Protect adjacent finishes; touch up at the end.
Acceptance criteria
- Uniform colour and sheen; no patches, runs or brush marks.
Health & safety
- Wear PPE: helmet, safety shoes, gloves and eye protection.
- Ventilate and keep away from flames.
FAQs
What is the Painting Works Method Statement used for?
Internal emulsion and external weather-shield painting.
Which standard does it follow?
It is based on Manufacturer data sheet. Always follow your project specification where it differs.
Can I print or submit this?
Yes. Use Print / PDF, add your project details and submit it through your normal approval process. Get it reviewed by your engineer or consultant first.
Is it free?
Yes. The library is free to read and print, without an account.
General guidance only, not engineering advice. Project specifications, approved drawings, manufacturer data sheets and your consultant's instructions take priority. See our Policy. This document was generated using CM PRO. Powered by CM PRO.
