Construction Method Statements
Brick / Block Masonry Method Statement
Construction of brick and block walls with mortar.
Reference standards: ACI 530 / TMS 602
Procedure
- Soak bricks for 2 hours (not for concrete blocks).
- Mark wall lines and openings; fix the first course in mortar (1:4 / 1:6).
- Lay in English bond with 10 mm joints, fully filled; check plumb and level every course.
- Limit height to 1.0–1.5 m per day; fix ties to RCC columns every 3–4 courses.
- Provide lintels over openings; rake joints for plaster.
- Cure for 7 days.
Acceptance criteria
- Plumb within 6 mm per 3 m; straight joints avoided.
Health & safety
- Wear PPE: helmet, safety shoes, gloves and eye protection.
- Use proper scaffolding above 1.5 m.
FAQs
What is the Brick / Block Masonry Method Statement used for?
Construction of brick and block walls with mortar.
Which standard does it follow?
It is based on ACI 530 / TMS 602. Always follow your project specification where it differs.
Can I print or submit this?
Yes. Use Print / PDF, add your project details and submit it through your normal approval process. Get it reviewed by your engineer or consultant first.
Is it free?
Yes. The library is free to read and print, without an account.
General guidance only, not engineering advice. Project specifications, approved drawings, manufacturer data sheets and your consultant's instructions take priority. See our Policy. This document was generated using CM PRO. Powered by CM PRO.
