Concrete & Masonry calculator

    Concrete Slab Calculator

    The free Concrete Slab Calculator by CM PRO helps site engineers, quantity surveyors, contractors and homeowners volume and cement, sand, aggregate for a slab. It supports both metric and imperial units and gives instant results for estimating RCC roof slabs, floor slabs and ground slabs before ordering cement, sand and crush.

    How the Concrete Slab Calculator works

    Wet volume = Length × Width × Thickness. Dry volume = Wet × 1.54. Cement, sand and aggregate are split by the mix ratio; cement bags = cement volume × 1440 kg/m³ ÷ 50 kg.

    How to use this calculator

    1. Sign up free and verify your email to unlock the calculator.
    2. Choose Metric (m, mm, m³, kg) or Imperial (ft, in, cft, lb) units.
    3. Enter the length, width, thickness, mix, cement, sand 1 (e.g. coarse / lawrencepur), sand 2 (e.g. fine / ravi), crush 1 (e.g. 3/4"), crush 2 (e.g. 3/8").
    4. Results update instantly — read the quantities in the Results panel.
    5. Add a wastage allowance and confirm against your drawings and specifications before ordering.

    Typical uses

    Estimating RCC roof slabs, floor slabs and ground slabs before ordering cement, sand and crush.

    Assumptions & limitations

    Results are planning estimates based on standard assumptions for concrete & masonry work. They do not replace structural design, site measurement or project specifications. Material densities, wastage and mix proportions vary by region and supplier.

    Frequently asked questions

    How does the Concrete Slab Calculator work?
    Wet volume = Length × Width × Thickness. Dry volume = Wet × 1.54. Cement, sand and aggregate are split by the mix ratio; cement bags = cement volume × 1440 kg/m³ ÷ 50 kg.
    Can I use the Concrete Slab Calculator in feet and inches?
    Yes. Switch to Imperial and enter feet, inches, square feet or pounds — the calculator converts automatically and shows results in imperial units.
    When should I use the Concrete Slab Calculator?
    Estimating RCC roof slabs, floor slabs and ground slabs before ordering cement, sand and crush.
    Is this construction calculator free?
    Yes. All CM PRO construction calculators are free — you only need to sign up and verify your email.

    Related searches: concrete slab calculator, slab concrete volume, cement bags for slab, RCC slab quantity, M15 M20 concrete mix.

    Also try these tools

    Run your whole site with CM PRO ERP