All guides

    Construction Method Statements

    Plain Cement Concrete (PCC / Blinding) Method Statement

    Placing lean concrete below footings and slabs on grade.

    Reference standards: ACI 301

    Procedure

    1. Inspect compacted formation and anti-termite treatment (if specified).
    2. Fix side shuttering and level pegs.
    3. Place polyethylene sheet if specified.
    4. Pour PCC (typically 1:3:6 or 1:4:8) to thickness 75–100 mm; compact and level.
    5. Cure for at least 7 days.

    Acceptance criteria

    • Thickness and level as per drawing; smooth, even surface.

    Health & safety

    • Wear PPE: helmet, safety shoes, gloves and eye protection.

    FAQs

    What is the Plain Cement Concrete (PCC / Blinding) Method Statement used for?

    Placing lean concrete below footings and slabs on grade.

    Which standard does it follow?

    It is based on ACI 301. Always follow your project specification where it differs.

    Can I print or submit this?

    Yes. Use Print / PDF, add your project details and submit it through your normal approval process. Get it reviewed by your engineer or consultant first.

    Is it free?

    Yes. The library is free to read and print, without an account.

    General guidance only, not engineering advice. Project specifications, approved drawings, manufacturer data sheets and your consultant's instructions take priority. See our Policy. This document was generated using CM PRO. Powered by CM PRO.

    Related guides