Material Recipes & Design Mixes
Tile Bond (Cementitious Tile Adhesive) Recipe
Polymer-modified cement tile adhesive similar to EN 12004 class C1/C2, for floor and wall tiles on cement backgrounds. Use a branded product where specified; this is a site/plant reference formula.
Reference standards: EN 12004, ANSI A118.4
| Ingredient | % by weight of powder | Role |
|---|---|---|
| OPC (Grade 42.5) | 35–40% | Binder |
| Silica sand 0.1–0.5 mm | 56–62% | Filler, dried |
| Redispersible polymer powder (VAE) | 1.5–3% | Bond & flexibility (C2 ≥ 3%) |
| Cellulose ether (HPMC) | 0.3–0.4% | Water retention, open time |
| Calcium formate | 0.5% | Optional accelerator |
| Mixing water | 22–26% of powder | ≈ 5.5–6.5 L per 25 kg bag |
Mixing & application
- Dry-blend powders thoroughly in a mixer; bag in moisture-proof bags.
- On site add powder to clean water, mix with a paddle at low speed for 3–5 minutes.
- Let it slake 5 minutes, remix briefly; use within 2–3 hours.
- Apply with a notched trowel (6–10 mm notch) on a clean, damp substrate.
- Press tiles with a twisting motion within 20 minutes of open time; keep joints with spacers.
- Grout after 24 hours.
Acceptance criteria
- Coverage ≥ 80% (walls) / 95% (wet & floor areas) when a tile is lifted.
- Tensile adhesion ≥ 0.5 MPa (C1) or ≥ 1.0 MPa (C2).
Health & safety
- Wear PPE: helmet, safety shoes, gloves and eye protection.
- Avoid inhaling powder.
FAQs
What is the Tile Bond (Cementitious Tile Adhesive) Recipe used for?
Polymer-modified cement tile adhesive similar to EN 12004 class C1/C2, for floor and wall tiles on cement backgrounds. Use a branded product where specified; this is a site/plant reference formula.
Which standard does it follow?
It is based on EN 12004, ANSI A118.4. Always follow your project specification where it differs.
Can I print or submit this?
Yes. Use Print / PDF, add your project details and submit it through your normal approval process. Get it reviewed by your engineer or consultant first.
Is it free?
Yes. The library is free to read and print, without an account.
General guidance only, not engineering advice. Project specifications, approved drawings, manufacturer data sheets and your consultant's instructions take priority. See our Policy. This document was generated using CM PRO. Powered by CM PRO.
