Construction Method Statements
Floor Screed Method Statement
Sand-cement screed under tiles or as base for floor finishes.
Reference standards: BS 8204
Procedure
- Clean the slab; set level points with the surveyor.
- Apply cement slurry bonding coat.
- Lay screed (1:4) between screeds to levels and slopes.
- Compact and finish with a float; provide joints at 4–6 m.
- Cure for 7 days.
Acceptance criteria
- Level within ± 5 mm; slopes to drains correct.
Health & safety
- Wear PPE: helmet, safety shoes, gloves and eye protection.
FAQs
What is the Floor Screed Method Statement used for?
Sand-cement screed under tiles or as base for floor finishes.
Which standard does it follow?
It is based on BS 8204. Always follow your project specification where it differs.
Can I print or submit this?
Yes. Use Print / PDF, add your project details and submit it through your normal approval process. Get it reviewed by your engineer or consultant first.
Is it free?
Yes. The library is free to read and print, without an account.
General guidance only, not engineering advice. Project specifications, approved drawings, manufacturer data sheets and your consultant's instructions take priority. See our Policy. This document was generated using CM PRO. Powered by CM PRO.
