All guides

    Construction Method Statements

    Floor & Wall Tiling Method Statement

    Installing ceramic and porcelain tiles with tile adhesive.

    Reference standards: ANSI A108, BS 5385

    Procedure

    1. Approve tile samples, adhesive and grout (submittal).
    2. Check screed/plaster level, slope to drains and waterproofing test.
    3. Set out from the centre line; plan cut tiles at edges.
    4. Apply adhesive with a notched trowel; back-butter large tiles.
    5. Fix tiles with spacers; level with a rubber mallet and level clips.
    6. Grout after 24 hours; clean and protect.

    Acceptance criteria

    • Lippage ≤ 1 mm; no hollow tiles; uniform joints.

    Health & safety

    • Wear PPE: helmet, safety shoes, gloves and eye protection.
    • Use wet cutting or dust extraction.

    FAQs

    What is the Floor & Wall Tiling Method Statement used for?

    Installing ceramic and porcelain tiles with tile adhesive.

    Which standard does it follow?

    It is based on ANSI A108, BS 5385. Always follow your project specification where it differs.

    Can I print or submit this?

    Yes. Use Print / PDF, add your project details and submit it through your normal approval process. Get it reviewed by your engineer or consultant first.

    Is it free?

    Yes. The library is free to read and print, without an account.

    General guidance only, not engineering advice. Project specifications, approved drawings, manufacturer data sheets and your consultant's instructions take priority. See our Policy. This document was generated using CM PRO. Powered by CM PRO.

    Related guides