All guides

    Test Method Statements

    Brick Compressive Strength & Water Absorption Test

    Testing burnt clay bricks for strength and absorption before approval.

    Reference standards: ASTM C67

    Equipment

    • Compression machine
    • Oven
    • Water tank
    • Scale

    Procedure

    1. Pick 10 random bricks per lot.
    2. Absorption: oven-dry, weigh, immerse 24 hours, weigh again; absorption % = (wet − dry) ÷ dry × 100.
    3. Strength: fill frogs with mortar, cure, cap, and load to failure.
    4. Strength = failure load ÷ bed area; average the results.

    Acceptance criteria

    • First-class bricks typically ≥ 10.3 MPa (1,500 psi) and absorption ≤ 20% — follow project spec.

    Health & safety

    • Wear PPE: helmet, safety shoes, gloves and eye protection.

    FAQs

    What is the Brick Compressive Strength & Water Absorption Test used for?

    Testing burnt clay bricks for strength and absorption before approval.

    Which standard does it follow?

    It is based on ASTM C67. Always follow your project specification where it differs.

    Can I print or submit this?

    Yes. Use Print / PDF, add your project details and submit it through your normal approval process. Get it reviewed by your engineer or consultant first.

    Is it free?

    Yes. The library is free to read and print, without an account.

    General guidance only, not engineering advice. Project specifications, approved drawings, manufacturer data sheets and your consultant's instructions take priority. See our Policy. This document was generated using CM PRO. Powered by CM PRO.

    Related guides