Submittal (Drawing / Material)
Submit shop drawings, materials and samples to the consultant for review and approval.
How to use the Submittal (Drawing / Material)
- Create a free account and verify your email.
- Open the Submittal (Drawing / Material) and enter the document title and header details.
- Add rows and enter the information from your site records.
- Review any calculated values, then save the document to your account.
- Use Print / PDF to print or save an A4 portrait copy from your browser.
Method: Fill in the project, consultant, submittal number, revision, type, spec or BOQ reference and the date a response is needed. List each drawing or material with manufacturer, copies or samples, then record the consultant's action code (A Approved, B Approved as noted, C Revise & resubmit, D Rejected) and remarks.
Note: An action code typed here is not a consultant approval. Keep the signed submittal and attachments, and resubmit with a new revision when the code is C or D.
Frequently asked questions
What is the Submittal (Drawing / Material) used for?
Submit shop drawings, materials, samples, method statements or test reports to the consultant for review and approval, with a clear action code.
How do I complete the Submittal (Drawing / Material)?
Fill in the project, consultant, submittal number, revision, type, spec or BOQ reference and the date a response is needed. List each drawing or material with manufacturer, copies or samples, then record the consultant's action code (A Approved, B Approved as noted, C Revise & resubmit, D Rejected) and remarks.
Is the Submittal (Drawing / Material) free?
Yes. Create a free CM PRO account and verify your email to use it.
Can I save and print this format?
Yes. Save the document to your account, then use Print / PDF and choose your printer or Save as PDF in the browser dialog.
Your saved documents belong to your account only. Calculations are aids — verify before official use. See our Policy.
