Non-Conformance Report (NCR)
Record a non-conformance, its root cause, disposition (rework, repair, reject, use-as-is), corrective and preventive action, and consultant closure.
How to use the Non-Conformance Report (NCR)
- Create a free account and verify your email.
- Open the Non-Conformance Report (NCR) and enter the document title and header details.
- Add rows and enter the information from your site records.
- Review any calculated values, then save the document to your account.
- Use Print / PDF to print or save an A4 portrait copy from your browser.
Method: Enter the NCR number, location, specification reference and category, then fill each section: non-conformance, requirement not met, root cause (5 Whys or 6M fishbone), correction, corrective action, preventive action and verification evidence. Select the disposition and close the NCR only after consultant re-inspection.
Note: A use-as-is disposition needs the consultant's written concession. The format records the NCR; it does not replace your contract's quality procedure or the engineer's decision.
Frequently asked questions
What is the Non-Conformance Report (NCR) used for?
Record work that does not meet the specification, decide its disposition and close it with evidence.
How do I complete the Non-Conformance Report (NCR)?
Enter the NCR number, location, specification reference and category, then fill each section: non-conformance, requirement not met, root cause (5 Whys or 6M fishbone), correction, corrective action, preventive action and verification evidence. Select the disposition and close the NCR only after consultant re-inspection.
Is the Non-Conformance Report (NCR) free?
Yes. Create a free CM PRO account and verify your email to use it.
Can I save and print this format?
Yes. Save the document to your account, then use Print / PDF and choose your printer or Save as PDF in the browser dialog.
Your saved documents belong to your account only. Calculations are aids — verify before official use. See our Policy.
