Coming soonDesign & visualisation100% free

    BIM & Smart 2D/3D Floor Planning

    Plan layouts, check clearances and present 2D and 3D house plans to clients with BIM thinking.

    5 modules · 15 lessons·Beginner·Optional verified certificate

    About this course

    What you will learn

    Good floor planning combines room sizes, circulation, structure and services before construction starts. Clients decide faster when they can see the space.

    This course introduces BIM concepts and practical floor planning, using the free CM PRO Smart Floor Planner for 2D layouts and 3D presentation.

    Who this course is for

    • Architects and draughtspersons
    • Builders and developers
    • Civil engineers
    • Interior designers
    • Students

    Curriculum

    5 modules · 15 lessons

    01BIM concepts
    1. 1.1What BIM means in practice
    2. 1.2Levels of detail and information
    3. 1.3Coordination between disciplines
    02Planning principles
    1. 2.1Plot, setbacks and orientation
    2. 2.2Room sizes and circulation
    3. 2.3Kitchens, baths and stairs
    03Structure and services
    1. 3.1Column and beam grid awareness
    2. 3.2Plumbing and electrical zones
    3. 3.3Ventilation and daylight
    042D and 3D with Smart Floor Planner
    1. 4.1Drawing rooms and walls
    2. 4.2Stairs, doors and furniture
    3. 4.33D presentation and PDF export
    05Presenting to clients
    1. 5.1Design options and revisions
    2. 5.2Area statements
    3. 5.3From plan to estimate

    Lesson titles are planned. The detailed roadmap, exercises and assessment are being finalised before launch.

    CM PRO Academy

    Certificate of Completion

    Verified Industry Credential

    This is to certify that

    Your Name

    has successfully completed all lessons and the final assessment of

    BIM & Smart 2D/3D Floor Planning

    Academic Director
    CM PRO Academy
    Verified
    Date of issue
    DD/MM/YY

    Credential ID: CMPRO-SAMPLE · verify at cmpro.pk/academy/verify/…

    Sample

    Sample layout only. Learning is free; the verified certificate is optional and issued for a small fee after the final assessment, with a unique online verification ID.

    Your skills

    By the end of this course you will be able to

    • Explain BIM concepts to your team
    • Plan practical house layouts
    • Present 2D and 3D plans to clients
    • Link layouts to quantity estimates

    Local, Gulf and international

    How this course fits your market

    Pakistan

    Uses common plot sizes and house layouts from Lahore, Karachi, Islamabad, Rawalpindi and Faisalabad housing schemes.

    Saudi Arabia & the Gulf

    Covers villa and apartment planning considerations for Saudi Arabia, the UAE and Qatar.

    International

    Introduces BIM principles aligned with ISO 19650 information management.

    Standards and project requirements vary by employer and project. Where a project specification, drawing or contract differs from course examples, the project document always takes priority.

    Practise now

    Free CM PRO tools you can already use

    You do not have to wait for the course. These free tools are open today and will be used in the lessons.

    Questions

    About this course

    Is the BIM & Floor Planning course free?

    Yes. All lessons, the syllabus and learning resources are 100% free. No payment card is needed to learn.

    Will I get a certificate?

    Yes, optionally. After you complete the lessons and the final assessment you can request the CM PRO Academy Verified Industry Credential for a small certification fee. It carries a unique online verification ID you can add to your CV and LinkedIn.

    When does the course start?

    The course is coming soon. Join the waiting list and we will email you when enrolment opens.

    Do I need Revit or AutoCAD?

    No. Practical lessons use the free CM PRO Smart Floor Planner in your browser.

    Get notified when this course opens.

    Free lessons and practical examples. Optional verified certificate for your CV.